This project was to upgrade the existing lower river walking track which follows the river and provides multiple viewing locations. This walking track followed the existing alignment with the project scope including construction of three new pedestrian bridges, three viewing platforms, and the renewal of the walking track. The walking track renewal consisted of stone edging the walking track with decomposed granite rocks and sealing with Ezi-Street asphalt. Works were completed in a very environmentally sensitive area of the World Heritage Wet Tropics with no incidents.

Supply of 85T of grade A283C plate, fabrication of 2 x dome roofs and rolled strake sections. Site works included removal of the existing dome roofs and top strakes. Repairs to the existing shell, installation of the new top strakes, internal stiffeners and dome roofs.
View Project
Installation of new 20KL FRP sodium hypochlorite storage tanks, a new chemical dosing panel and dual-wall piping. The scope also covered electrical works, SCADA integration, building modifications, access platforms, civil works, chemical-resistant coatings and safety shower installation.
View Project
Replacement of a CN2600 Butterfly Valve and 2 DN1200 Main Inlet Valves. Works involved the removal of the existing 50 year old valves, installation of new valves, pipework modifications, hydraulic works, electrical works and new access platforms.
View Project