This project was to upgrade the existing lower river walking track which follows the river and provides multiple viewing locations. This walking track followed the existing alignment with the project scope including construction of three new pedestrian bridges, three viewing platforms, and the renewal of the walking track. The walking track renewal consisted of stone edging the walking track with decomposed granite rocks and sealing with Ezi-Street asphalt. Works were completed in a very environmentally sensitive area of the World Heritage Wet Tropics with no incidents.

Fabrication of 600 tonne of steelwork for wharf expansion, permanent and temporary steelwork in mild and stainless, pile welding. Fabrication to 5131CC3.
View Project
Pipeline welding and mechanical package. 1500+ welds on lines from Behana intake to new Edmonton treatment plant. Above ground mechanical supply and installation package.
View Project
Spliced 100+ mild steel piles to MRTS68. All works undertaken in environmentally sensitive World Heritage areas.
View Project