This project included the upgrade of 3 x manager residences located at River Drive, Weipa. Local resources and labour were used on this project to support the community. Works involved asbestos removal and the full refurbishment of each residence. Works were completed within time and budget.

Supply of 85T of grade A283C plate, fabrication of 2 x dome roofs and rolled strake sections. Site works included removal of the existing dome roofs and top strakes. Repairs to the existing shell, installation of the new top strakes, internal stiffeners and dome roofs.
View Project
Installation of new 20KL FRP sodium hypochlorite storage tanks, a new chemical dosing panel and dual-wall piping. The scope also covered electrical works, SCADA integration, building modifications, access platforms, civil works, chemical-resistant coatings and safety shower installation.
View Project
Replacement of a CN2600 Butterfly Valve and 2 DN1200 Main Inlet Valves. Works involved the removal of the existing 50 year old valves, installation of new valves, pipework modifications, hydraulic works, electrical works and new access platforms.
View Project